Quality System Certification |
| |
_ Previously Motorola Korea Limited founded in March 1967
_ ISO9002 certified by SGS-Yarsely in December 1993.
_ QS9000 certified by LRQA(Lloyd Register Quality Assurance)
in June 1997 with the remarkable comment of ¡°SECOND TO NONE¡± facility
_ Continuous Zero Non-Compliance from LRQA¡¯s Surveillance or Special
Audits
_ TS16949 certified by LRQA in August 2003
|
|
| |
Assessment History
|

|
|
Environment Control |
| |
Utility Control
_ N2 in-house facility and LN2 & Hydrogen supplied by outside vendor
_ Gas purity and moisture monitor
_ DI water control for bacteria, resistivity and total organic carbon
 |
| Item |
Control limit |
 |
Bacteria |
10 colony/cc |
 |
Resistivity |
14 mega ohm |
 |
Organic Carbon |
1 ppm |
 |
|
| |
Particle Control
_ Clean room is designed per FED-STD-209D & IES-RP-CC012
_ Positive air pressure control, differential pressure(>0.2mmAq.) with real
time BAS monitoring on the line requiring <1000 particles
_ Particle monitor with portable counter once/month
 |
| Class |
Control limit |
 |
10(0.5 micron) |
10/cubic feet |
 |
1K |
1K |
 |
10K |
10K |
 |
100K |
100K |
 |
|
| |
ESD Control
 |
| Conductive Floor |
Surface Resistivity |
105 - 109 Ohms/Square |
 |
Dissipative Smock |
Surface Resistivity |
105 - 1011 Ohms/Square |
 |
Dissipative Shoes |
Surface Resistivity |
105 - 1011 Ohms/Square |
 |
Ionizer Control |
Decay Time(1000v ¡æ100v) |
< 10 seconds |
 |
|
Balance (volt) |
< 35 volt |
 |
Equipment |
Resistance to Ground |
< 10 Ohms |
 |
Work table |
Table mat top to Ground |
105 - 109 Ohms |
 |
Conductive Chair |
Seat to Floor Resistivity |
<109 Ohms |
 |
|
|
|

|
|
New Product/Process Introduction |
|

|
|
Piece Parts Qualification |
|

|
|
Supplier Quality Control |
|

|
|
Process Control Cycles |
|

|
|
Corrective Action Development |
| |
_ Immediate Corrective Action as a Containment within 24 hours
_ System Review for Following Items
What is the Current Quality System/Practice
What are the Opportunities in addition to
System Development covering all Opportunities
System Institutionalization Across the Company
_ Documentation within 7 calendar days- 8D Methodology
_ Verification Audits / Effectiveness of Implementation
_ Management Review
|
|

|
|
Statistical Process Control |
|

|
|
Data Collection and Sharing |
|
|

|